Value – £60,000
Duration – 4 Weeks
The existing tiled floor had failed to adhere fully and was causing some problems. We were asked to strip out and re-tile the whole foyer area at this Cinema, whilst it remained open, which was a logistical challenge in itself! We worked very closely with the site team to work out the customer flow and the areas that needed to be kept accessible. Erecting a solid hoarding, with extraction to avoid dust in the customer areas ensured that noise and dust were kept to an absolute minimum.
The hoarding was moved into different zones ensuring that the cinema could maintain “business as usual”. Working within a Shopping Centre meant that we not only had to take into account the operational requirements of Cineworld but also of its surrounding neighbours and the shopping centre itself. The project was handed over on time and on budget.